Inspection Information

Work Requiring Inspection

Electrical Items

  • Grounding protection to all new electrical systems
  • Outlets
  • Services installed
  • Switches

Plumbing Items

  • 24 hour water leak detection
  • Installation to perform according to Plumbing Code Standards
  • Required glue by code for installation

Additional Work Requiring Inspection

  • All maintenance and repair to major items
  • Concrete
  • Framing
  • HVAC
  • Roofing
  • Window Installation

All the above to be installed by construction standards to Building Code requirements.